Constructability

Test the design against execution realities, before tender or construction.

Find site problems before the site

Erection sequences, access, lifting capacity, prefabrication, interfaces between packages, tolerances: a constructability review tests the design against how the works will actually be built.

Done early, it prevents rework, variations and delay; done late, it limits the damage.

Who it is for

  • Industrial owners
  • EPC and general contractors
  • Design teams

The issues we address

Design ignores methods

Elements too heavy for planned cranes, impossible sequences.

Orphan interfaces

No one draws or owns the junction between two packages.

Prefabrication comes too late

Once drawings are frozen, it is too late to industrialise.

What we deliver

  • Constructability issues register
  • Sequence and lifting analysis
  • Recommendations quantified in cost and time
  • Close-out workshop with the teams
  • Implementation follow-up

Our approach

  1. ScopingProject stage, documents, priority issues.
  2. ReviewDocument analysis and targeted interviews.
  3. WorkshopDecisions on recommendations with the teams.
  4. Follow-upCheck that changes reach the documents.

What you gain

Less reworkProblems solved on paper, not on site.
Protected scheduleSequences and resources validated.
Fewer disputesInterfaces clarified and assigned.

Related services

AWP / WFP

Organise execution in packages.

Learn more

P6 planning

A realistic, defensible schedule.

Learn more

Structural design

A buildable design from the start.

Learn more

Let’s talk about your project

Describe your need in a few lines: our teams come back within two working days with a first proposed scope.