Quality control
Quality plans, inspection, testing, non-conformities and handover.

Quality is built in, not inspected at the end
A non-conformity found at handover costs far more than one prevented at a hold point. For owners or contractors, we set up and carry out quality control of the works: quality plans, inspection and test plans, shop and site inspections, non-conformity management, handover records.
Who it is for
- Owners
- General and EPC contractors
- Steel and precast fabricators

The issues we address
Late inspection
The defect is found once it is already buried in concrete.
Non-conformities left open
Opened, never analysed, never closed.
Incomplete handover file
Missing tests, certificates and as-built drawings.
What we deliver
- Project quality plan
- Inspection and test plans (ITP)
- Concrete, rebar, steelwork and connection checks
- Shop and site inspections
- Non-conformity and corrective-action management
- Handover documentation
Our approach
- Set upQuality plan, ITPs, hold points, responsibilities.
- InspectInspections, tests, reports, dated photos.
- CorrectNon-conformities analysed and closed.
- Hand overSnag closure and final records.
What you gain
What we inspect
Every element has its critical points. Our inspectors step in where a defect is most expensive to correct.
Concrete and cast-in-place works
- Materials and mix approval
- Slump, test cubes, strengths
- Formwork, pouring, vibration, curing
Reinforcement
- Grades, diameters and bending
- Cover, spacers and laps
- Pre-pour inspection (hold point)
Structural steelwork
- Mill certificates and traceability
- Welds: visual and non-destructive testing
- Bolt tightening, corrosion protection
Precast
- Factory inspections
- Dimensional tolerances
- Handling, storage, erection
Earthworks and foundations
- Excavation bases and bearing
- Compaction and plate-load tests
- Setting-out and levels
Records and handover
- Inspection sheets and test reports
- As-built drawings
- Handover documentation file
Standards and performance tracking
Technical references
- Moroccan standards (NM)
- Eurocodes
- EN 13670 — execution of concrete structures
- EN 1090 — execution of steel structures
- Contract specifications
Inspection refers first to the contract documents: specifications, approved drawings and the standards they cite. Every deviation is judged against a written requirement, never a preference.
ECPM’s quality control is performed on behalf of its client; it does not replace statutory technical inspection where required.
Related services
Let’s talk about your project
Describe your need in a few lines: our teams come back within two working days with a first proposed scope.